Construction report, 29 Nov 2025

Construction report Time Square 7 2025-11-29 · date from document content Original: EN 27 pp.

A newer version exists: Construction report, 9 Dec 2025

Summary

Temporary I-beam bracing removed; B2 slab 30%; lift-core walls started (5%).

Key facts

Bracing removal 100%B2 slab 30%Lift core 5%