Construction report, 19 Apr 2026
A newer version exists: Construction report, 9 May 2026
Summary
Structure reaches the 7th–8th floor: 7F lift core 30%, 8F scaffolding started.
Key facts
7F lift core 30%8F scaffolding 20%