Construction report, 9 Jun 2026

Construction report Time Square 7 2026-06-09 · date from document content Original: EN 46 pp.

A newer version exists: Construction report, 19 Sep 2026

Summary

8F structure 85%: slab rebar, post-tensioning and MEP done; concrete pour under way with slump testing.

Key facts

8F structure 85%8F PT & MEP done