Construction report, 9 Sep 2025
A newer version exists: Construction report, 29 Nov 2025
Summary
Excavation 65%, shoring 70%, basement level B2 structure 30%.
Key facts
Excavation 65%Shoring 70%Basement B2 30%
Download PDF 5.1 MB
Originals are kept off the site; web copies are compressed.
Preview







More from this project
- Construction report, 19 Sep 2026 · 2026-09-19
- Construction report, 9 Jun 2026 · 2026-06-09
- Construction report, 9 May 2026 · 2026-05-09
- Construction report, 19 Apr 2026 · 2026-04-19
- Construction report, 9 Mar 2026 · 2026-03-09
- Construction report, 28 Feb 2026 · 2026-02-28