Construction report, 9 Aug 2026

Construction report Time Square 8 2026-08-09 · date from document content Original: EN 19 pp.

Summary

Excavation 97% (3rd layer to −9.5 m), pile caps 75%, PC4 cast; PC2 and tanks scheduled for mid-August.

Key facts

Excavation 97%Pile caps 75%−9.5 m level